Placeholder — Level 2 home chargers, wired and permitted by a licensed electrical contractor. Panel capacity is checked first so you know the honest answer before anything is installed.
Placeholder — a paragraph at realistic length describing the scope: assessing panel capacity, running the new circuit, mounting and connecting the charger, and the ESA permit and inspection.
Placeholder — a second paragraph on what the quote covers, how long the work takes, and what the homeowner needs to decide beforehand. Roughly this much text.
01
Send a photo
Placeholder — a photo of your panel and where the charger goes is usually enough to quote.
02
Fixed quote
Placeholder — a written quote with the permit included. No surprises on the day.
03
Install day
Placeholder — most charger installs are done in a morning.
04
ESA inspection
Placeholder — the work is inspected and you keep the certificate.
Can my panel handle an EV charger?
Placeholder — how capacity is checked and what happens if it falls short. Two sentences.
Do you supply the charger or do I?
Placeholder — either works; what's typical and what it changes. Two sentences.
How long does installation take?
Placeholder — what the day looks like. Two sentences.
Is a permit needed for a charger?
Placeholder — yes, and why that protects you. Two sentences.
Licensed, insured, local
ESA/ECRA Lic. 7013923
Master electrician · 7 years in business
419 Kelly Cresc, Newmarket, ON
★ 4.9 from 28 Google reviews
Serving Newmarket, Aurora, East Gwillimbury, Bradford, King, Richmond Hill, Keswick, Stouffville, Georgina, Uxbridge, and Markham.
Other services
Send a photo of your panel. Get a straight answer.
Contact Us Now